Skip to content

#NorthInnerCity Traffic & Works Update – April 29th

TEMPORARY ROAD CLOSURES

Smithfield & New Church Street, Dublin 7:

• Location A: Smithfield – along square (from New Church Street to Phoenix Street) Dublin 7, from 07.00hrs to 14.00hrs on Friday 20th May 2022.

• Location B: New Church Street (Bow Street to Smithfield) Dublin 7, from 06.00hrs on Saturday 30th April 2022 to 24.00hrs on Sunday 1st May 2022.

• Closed to facilitate crane lifting operations.

Smithfield :

• Pedestrian access to be maintained at all times.

• Traffic wishing to turn left from New Church Street onto Smithfield (in south direction) will be diverted on Smithfield (in north direction) 

New Church Street:

• Pedestrian access to be maintained at all times.

• Section of Friary Avenue between Friary Groove and Bow Street will be operating in 2 way shuttle system.

• Exit from Friary Groove will be controlled by flagman.

• Diversion for closed section of New Church Street will be provided via Friary Avenue (shuttle system) and onto Smithfield.

• Section of Smithfield between New Church Street and Friary Avenue will be closed with limited local access allowed.

Parnell Square North, Dublin 1:

• Closed (from Parnell Square East to Parnell Square West), Dublin 1 from 07.00hrs to 22.00hrs on Sunday 1st May 2022.

• Closed to facilitate an event for La Mor Na Gaeilge.

• Traffic on Parnell Square West will be diverted Granby Row/Mountjoy Street/Berkeley Street/Eccles Street/Temple Street and Great Denmark Street

• Pedestrian and local access will be maintained.

O’Devaney Gardens, Dublin 7:

• Closed (from North Circular Road for 145m), Dublin 7 from 00.00hrs on Monday 11th April 2022 to 24.00hrs on Monday 2nd May 2022.

• Closed to facilitate the completion of road tie-ins for the O’Devaney Gardens Housing, Project Phase 1.

• Traffic on North Circular Road wishing to travel on O’Devaney Gardens to Montpellier Gardens will be diverted via Infirmary Road.

• Traffic on Thor Place wishing to travel on O’Devaney Gardens to North Circular road will be diverted via new temporary road, Montpelier Gardens and Infirmary Road.

• Pedestrian and local access will be maintained.

DISRUPTIONS
#NORTHINNERCITY

Parnell Square:

Across Parnell Square West & East.

Works Involved: Road Closure for La Mor Na Gaeilge DCC Event.

Date of Works: 1st May, 7am – 8pm.

Contractor: DCC – FFT

Custom House Quay:

Bus Lane 130 metres  west from Matt Talbott Memorial Bridge

Works Involved: Fitting Frame and Cover

Date of Works: 4th May, evening.

Contractor: Colt / M&M Contractor

Dorset Street Upper:

Between Eccles Street and Frederick Street

Works Involved: Sewer relining.

Date of Works: 3rd – 5th May, 7pm – 5am.

Contractor: Irish Water / GMC Utilities.

East Wall Road:

Around Forth Road.

Works Involved: Trial Holes for New Cycle Track west bound. Monday and Tuesday daytime awaiting confirmation of ESB/Gas Supervision.

Date of Works: 29th April – 6th May.

Contractor: DCC Traffic Division / Citius.

Amiens Street:

Between Buckingham street junction and the Five Lamps junction.

Works Involved: Traffic management set up in bus lane for excavation works. Lanes altered. All 4 lanes remain open.

Date of Works: 30th April – 6th May.

Contractor: DCC Traffic Division / Clonmel Enterprises.

raymcadam View All

Fine Gael Councillor - North Inner City

Chair, Urban Form & Planning Strategic Policy Committee

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: